Client: Emirates Petroleum Products Company L.L.C (EPPCO)
MAJOR PROJECTS: Underground Diesel Gas Oil (DGO) Pipe Line Project-Terminal 1 Upgradation of Tanker Truck Loading Rack (TTLR) Piping System.
Above Ground Fire Water Piping Ring in Terminal 1 – JAFZA
Year of Construction: 2018-2020
Type of contract: EPC Contractor
Systems: Diesel Gas Oil (DGO) Piping: Tanker Truck Loading Rack (TTLR) : Pumping Station Power/control Cable Network : Firewater Network (Sea water Application) : Terminal Communication/CCTV system : Instrumentation and Control
MECHANICAL: Detailed Engineering & Stress Analysis. Underground 16” DGO pipeline from Berth to Terminal 1 with Tie ins. Aboveground 14” API 5L Piping (1 KM) with Internal Fusion Bond Epoxy Coating & outer Painting. TTLR piping upgradation for product segregation. Structural Steel supports for the pipeline, Valve Operating Platforms & Crossover platforms.
ELECTRICAL: MCC to Jet Fuel Pumping station power/control cabling, Inline heat shrink cable jointing, Optical Fiber Cabling/Splicing, OTDR testing, Local control stations, TTLR control panel upgradation.
CIVIL: Pneumatic/Suction Excavation in explosive or hazardous atmosphere for underground piping/cabling. Foundations for pipe supports, operating platforms. Construction of Valve chambers/Manholes for underground services.
SHUTDOWN: Shutdown, Draining & Isolation of Berth to Storage Terminal Loading Pipeline for tie in with the new pipeline. Jet Fuel Pumping station MCC shutdown for inline cable joints.
APPROVALS OBTAINED: Trakhees (EHS & CED), Abu Dhabi Civil Defense (DCD), JAFZA